Verifiable changes to Vistral Studio Spark

This log avoids retroactive releases and announcements that do not match the product. The dates below represent confirmed code changes; final availability may still depend on configuration, account, or provider.

August 1, 2026 — public content and SEO foundation

This stage added the public content and discovery foundation, including editorial structures for institutional and search-intent pages and their related technical SEO signals.

July 18, 2026 — YouTube and plan copy

The YouTube integration workflow and plan copy received verifiable updates. The integration still requires valid credentials, permissions, and an existing video.

July 15, 2026 — watermark and consent-based analytics

Free downloads began receiving a watermark. Analytics behavior was also updated to respect consent before the corresponding collection starts.

July 14, 2026 — resilience, OAuth, queue, and SEO

Verified work covered resilience and changes to OAuth, queue processing, and SEO. Internal details that could expose controls or infrastructure are intentionally omitted from this public summary.

Explore the product as it exists today

Check the features visible in the interface and use this log to follow confirmed changes.

Verifiable changes to Vistral Studio Spark